Category
Utility
Client
Fairfax County Water Authority
Location
Lorton, Virginia
Key Challenges & Project Details
- Consisted of 800′ of 84″ raw water intake and 2,300′ of 84″ raw water discharge from Occoquan Pump Station to the water treatment plant
- 84″ steel intake constructed within a 10′ diameter rock tunnel across the Occoquan River
- Two shafts, 35′ diameter and 14′ diameter, were constructed 80′ deep at either end of the tunnel
- An 84″ connection was constructed into the existing water line on one end
- 84″ PCCP discharge was constructed along a quarry wall in solid rock
- Pipeline included extensive cathodic projection
- 24″ overflow decant line was installed from the quarry to the river with excavation cuts of 30′ in solid rock
- Also included yard piping for the pump station from 6″ to 36″ in diameter, including valves and fittings